Sewage Treatment Plant - Reed Bed Installations

HMV Utilities Ltd install all types of commercial and domestic effluent waste control systems. Their latest innovation is the "Reed Bed" sewage treatment system and a flow graphic sequence of installation is outlined below.

Select a graphic for a more detailed presentation.

1. The supply and installation of packaged sewage treatment plants for commercial and domestic premises.
2. The installation of reed beds to work in conjunction with packaged sewage treatment plants.
3. Packaged pumping stations for surface water and sewerage.
4. Maintenance of existing units and reed beds.
5. Repair and replacement of old installations in accordance with the 2000 Building Regulations.

Waste Management
The dug out and boarded out area with a water resistant membrane ready for a concrete
base
.
 
Environmental Treatment Plant
The concrete base being poured.
 
Waste Management
The unit in position ready for the final concrete backfill.
Environmental Treatment Plant
The reed beds tanks in situ being filled with gravel.
 
Environmental Treatment Plant
The installation of the treatment unit and sewage pipes.
 
Environmental Water Management
The beds with reeds planted.
Analysis Of Site Water
The installation of reed beds.


 
Analysis Of Site Water
The unit in position ready for the final concrete backfill.
 
Analysis Of Site Water
The unit fully installed with cover fitted.

 
Analysis Of Site Water
The control box for the treatment plant.
 

 
Environmental Water Management

Water Risk Assessment Water Risk Assessment Water Risk Assessment